MDC Campus

38.73088, -77.50829
1,000,000 SF | 92,903 SM
300 MWs Available Critical Load
300 MWs Total Critical IT Load
RFS Within 20 Months
mdc

Campus Overview

CloudHQ’s MDC campus is located in the heart of the Manassas data center market just south of the intersection of Routes 28 and 234. The two on-site substations will provide up to 300 MWs of critical IT load which can be delivered in many different configurations. The first data center, MDC1, can be ready for service in less than twenty-two months from commitment. The MDC campus is connected to CloudHQ’s Manassas Fiber Highway which provides exclusive fiber conduit ducts from our Manassas campuses to the long-haul fiber interconnection points along Route I-66.