SJC Campus

37.35936, -121.94266
300,00 SF | 27,871 SM
42 MWs Available Critical Load
42 MWs Total Critical IT Load
RFS Within 2030
sjc (2)

Campus Overview

After almost a decade of site accumulation, power negotiation, and state-of-the-art design initiatives, CloudHQ is relieved to market our SJC1 data center. A multi-story data center designed with flexible room densities, the building can accommodate multiple types of deployments. Backup power will be provided by exterior, mounted generators and heat rejection will be accomplished via rooftop air-cooled chillers. An on-site substation will deliver medium-voltage power.