CDG Campus
48.59768, 2.40782
900,00 SF | 83,613 SM
74 MWs Available Critical Load
150 MWs Total Critical IT Load
RFS Within 22 Months
Campus Overview
CloudHQ’s CDG campus is strategically located to the south of Paris, in the established hyperscale location of Lisses. The campus offers two 74.4 MW IT Load buildings, both fully permitted and powered by a new 225 kV on-site substation. CloudHQ has invested by building diverse fiber duct infrastructure from the campus to two interconnection points, offering hyperscale capacity and access to established metro locations.