Our Frankfurt campus, located in Offenbach Germany, will provide 115.2 MWs of IT load via two 570,000 SF (52,955 SQM) two-story data centers.  With excellent fiber availability, the site is sub one-millisecond roundtrip to Frankfurt and the local area network hubs.  Both data centers will be supplied via an on-site substation with power provided by Energieversorgung Offenbach (EVO).

Features

Site Features

  • 36 acres (14.5 hectares)
  • 2 two-story data centers planned
  • Excellent fiber/telecommunications availability
  • On-site substation to be developed

Proposed Data Center Features

  • 115.2 MWs of IT Load via dedicated on-site substation
  • 650,000 SF (60,385 SQM) of private computer room space
  • Non-evaporative heat rejection system
  • < 1.25 annualized PUE
  • 24x7x365 on-site security staff
  • Electronic card-key access system with biometric screeners

Other Locations

Our London campus, located outside England’s capital city, will provide 90 MWs of IT load via two 370,000 SF (34,375 SQM) single-story data centers.  Ample fiber availability provides sub one-millisecond roundtrip travel times to Slough.  Both data centers will be supplied via an on-site substation with power provided by Scottish & Southern Electricity Networks (SSE).

View Details

London (ENG1 & ENG2) Campus

London, UK

MDC, our second data center campus located in Manassas, Virginia, will provide 135 MWs of IT load in over 800,000 SF via three single-story data centers.  Ample fiber availability provides sub half-millisecond roundtrip travel times to major Ashburn interconnection points.  A 240 MW Dominion Virginia Power substation will be constructed on-site to support the MDC campus.  MDC1 is site plan approved and ready for development.

View Details

Manassas (MDC) Campus

Manassas, VA